Technical Data & Safety Info
Benefits of PAR
- Instant and permanent fix for potholes
- Ready to use, no mixing required, in convenient packaging
- Proven to outlast surrounding pavement
- Use in wet or dry conditions
- No seasonal grades
- No primer or tacking materials necessary
- Can be used in all weather conditions wet or dry
- Set up time – immediate. No waiting for hot mix
- Available in 20 kg bags
- Easy to use 3 step repair method
- Open to traffic immediately after repair
- Unused PAR will stay usable in container
- One year shelf life
How to apply PAR
EASY AS 1, 2, 3!
1. Clean out all loose chunks or debris using a stiff broom or blower to achieve a sound surface to bond to.
2. Place PAR in the hole in layers of 3 inches at a time and tamp the area until firm. The last layer of PAR is to be 25% higher than the finished level.
3. Compact the PAR with a tamper, roller or by driving over it until the desired level is obtained.
Done!
PAR FAQs
Immediately if sand or powder is coated over the PAR to remove and stickiness.
It is a permanent fix.
Ideally a tamper or concrete compactor.
If you are looking for a long term solution – yes, you do.However, it will still reduce the pothole if only one edge is evident. It might need reapplying 12 months later.
0.5sqm at 25mm depth.
Yes you can. Call us now for bulk pricing.
Yes you can. As long as it is compacted afterwards.
Yes, but ideally you would need to cover it with a tarp.